The Town of Tillsonburg undertakes various construction projects throughout the spring, summer and fall. This work can range from minor curb or sidewalk repairs, to full road reconstruction projects and may result in traffic delays.
Find out what's happening in your neighbourhood
Want to see where construction zones are in Tillsonburg, or learn more about infrastructure, development or utility projects in your neighbourhood? Click the button below to view projects on a map, review background information, get contact information for contractors and more.
Caution and Disclaimer:
These infrastructure projects may change in nature, location or timing. They may not occur at all as a result of changes in resources, priorities or other circumstances. These changes may occur before works are begun or as the works are carried out. As a result, the Town of Tillsonburg, its elected officials, officers, employees, contractors and agents will not assume any responsibility or liability for any costs, damages, losses, liabilities or expenses suffered whatsoever as a result of, the use of, or reliance upon this information.
Project and program information
Project Description:
Repair of overflow pipe at the Lake Lisgar weir and repair to valve allowing open and close of overflow weir.
Streets Affected:
- Concession Street East
- Park Ave
Timeline:
April – May (Complete)
Impacts to residents:
- Traffic detours and delays
Contractor and Contact Person:
Watech Services Inc.
Project Description:
Sanitary replacement along John Pound Road, including the installation on new permanent sanitary by-pass. Installation of new sanitary pipes, maintenance holes and restoration of roadway is included in this project.
Streets Affected:
- John Pound Road
- Bloomer Street
- Broadway Street
- Savannah Court
Anticipated start date:
June 2025 – August 2025 (Complete)
Impacts to residents:
- Traffic delays
- Construction activities : dust, noise, vibrations, interruptions to services
Contractor and Contact Person:
Birnam Excavating Ltd.
Project Description:
Full replacement of Kinsmen Bridge with prebuilt pedestrian bridge including the renovation of supports.
Streets Affected:
- Participark Trail from Concession Street West entrance to Washington Grand Ave entrance
- Veterans Memorial Walkway from Wilson Ave to Rolph Street
Timeline:
August 2025 – December 2025
Impacts to residents:
- Pedestrian detours and constraints
- Construction activities: dust, noise, vibrations
Contractor and Contact Person:
Lancoa Contracting Inc.
Project Description:
Replacement of existing twin culvert with new twin CSP culverts, including the addition of storm infrastructure and road rehabilitation.
Streets Affected:
-
Devonshire Avenue
Timeline:
September 2025 – October 2025
Impacts to residents:
- Full road closure resulting in detour
- Construction activities : dust, noise, vibrations, interruptions to services
Contractor/Contact Person:
Cassidy Construction
Project Description:
Resurfacing roads and paving new asphalt surface including adjustment of existing structures.
Streets affected:
- Concession Street East between Park Ave and Lisgar Court
- Clarke Street West
- Eleanor Court
Timeline:
September 2025 – October 2025
Impact to residents:
- Traffic detours and delays
- Construction activities : dust, noise, vibrations
Contractor and contact person:
Dufferin Construction Company
Project Description:
Full urbanization including storm, sanitary, water, culvert restoration, curb and sidewalk installation.
Streets affected:
- Cranberry Road at North Street East to northern Town limits
Timeline:
September 2025 – December 2025
Surface Asphalt – Fall 2026
Impact to residents:
- Traffic detours and delays
- Construction activities : dust, noise, vibrations
Contractor and contact person:
Sierra Construction Inc.
Project Description:
Primary feeder extension, including installation of sidewalks, storm infrastructure, parking stalls and construction disturbance restoration.
Contractor and Contact Person:
Dufferin Construction Company
Project Description:
Underground storm infrastructure reconstruction, water infrastructure, asphalt maintenance and sidewalk restoration. Regrading of ditches in the area was also included in this scope of work.
Contractor and Contact Person:
PV EX Construction Ltd
Project Description:
Replacement of retaining wall above existing culvert, including sidewalk and fence replacement.
Contractor and Contact Person:
Van Bree Infrastructure
Project Description:
Replacement of elevated sanitary, including the installation of two support piers.
Contractor/Contact Person:
RVM Trucking
Project Description:
The project involves the installation of surface asphalt once the maintenance period of the work completed within 2022 has elapsed.
Streets Affected:
- Lindsay Street - Project limits on Lindsay are Magnolia Drive to Tillson Ave
- Frances Street - Project limits on Frances are from Kara Lane to Tillson Ave
Timeline:
May to September 2023
Impacts to residents:
- Traffic Detours and delays
- Project will not impact school bus drop off
- Major construction works on Frances will not take place until student summer break
Contractor and Contact Person:
Euro-Ex Construction
John Reeves (519) 533-1688
Project Description:
- Project includes new storm sewers, asphalt, curb & gutter, and sidewalks
- Project also includes upgrades to watermain infrastructure
Streets Affected:
- Young Street
Anticipated start date:
Spring/Summer 2023
Impacts to residents:
- Traffic delays
- Intermittent impacts to driveway access during construction hours
- Further communication to impacts on residents will be provided as constriction progresses
Contractor and Contact Person:
To Be Determined
Project Description:
The project involves the complete reconstruction of two retaining walls near Beech Boulevard, Fairway Hills Boulevard on Quarter Town Line.
Streets Affected:
- Quarter Town Line - Project limits along Quarter Town Line are from Fairway Hills to Beech Boulevard.
Timeline:
May to August 2023
Impacts to residents:
- Traffic Detours and delays
- Sidewalk closure on east side of Quarter Town Line
Contractor and Contact Person:
To Be Determined
Project Description:
Full depth asphalt rehabilitation (replacement of base and surface asphalt)
Timeline:
Additional information letters to residents will be distributed once the construction schedule is finalized with more details regarding the project
Impacts to residents:
Traffic detours and delays
Contractor/Contact Person:
To Be Determined
Project Description:
The project involves the construction of a new ditch along the west side of Bell Mill Side Road, and the re-ditching along the North side Spruce Street.
Streets affected:
- Bell Mill Side Rd
- Spruce Street
- Town Line Road
Timeline:
May to June 2023
Impact to residents:
Traffic detours and delays
Contractor and contact person:
To Be Determined
Project Description:
Full depth asphalt rehabilitation (replacement of base and surface asphalt) on various streets in Town.
- Eric Court
- Christie Street
- Virginia Street
- Poplar Street
- Dereham Drive
- Clear Valley Drive
- Beth Court
Timeline:
May to August
Impacts to Residents:
Traffic detours and delays
Contractor and Contact Person:
N/A - TBD
Project Description:
The project involves the complete reconstruction of the pavement structure including new barrier curb and gutter, sidewalks, the installation of new storm sewers and catch basins, new watermain and service laterals, new sanitary sewers. The project schedule will work around school requirements.
- Lindsay Street
- Frances Street
Timeline:
May to September
Impacts to Residents:
Traffic detours and delays – Project will not impact school bus drop off
Project Description:
The project involves the complete reconstruction of two retaining walls near Beech Boulevard on Quarter Town Line.
- Quarter Town Line
Timeline:
May to August
Impacts to Residents:
Traffic detours and delays
Project Description:
Completing the surface asphalt within 2021 reconstruction zones.
Timeline:
May to July
Impacts to Residents:
Traffic detours and delays
Project Description:
Completing the surface asphalt within 2021 reconstruction zones.
Timeline:
May to July
Impacts to Residents:
Traffic detours and delays
Project Description:
Completing sodding from 2021 reconstruction.
Timeline:
May to July
Impacts to Residents:
Traffic detours and delays
Asphalt Paving Program
The Town of Tillsonburg uses a pavement management system to determine which streets should be resurfaced in any given year. Pavement conditions, pavement age, traffic volumes and maintenance records all influence the timing and need for resurfacing.
If your street is selected for resurfacing, you will receive an Asphalt Paving Program Notice approximately two (2) weeks before construction begins. The work on each street will take six (6) to eight (8) weeks to complete. Construction takes place in phases and there may be delays between each stage.
The Town uses contractors to complete the following road resurfacing work:
- repair of concrete curbs, sidewalks and catch basins
- raise and adjust manholes
- remove and replace asphalt surface
- restore any damage to sod, driveways and private curbs resulting from the construction
Caution and Disclaimer:
These infrastructure projects may change in nature, location or timing. They may not occur at all as a result of changes in resources, priorities or other circumstances. These changes may occur before works are begun or as the works are carried out. As a result, the Town of Tillsonburg, its elected officials, officers, employees, contractors and agents will not assume any responsibility or liability for any costs, damages, losses, liabilities or expenses suffered whatsoever as a result of, the use of, or reliance upon this information.